Montebello Corridor Grade Separation

Client| Alameda Corridor East

2024 - Ongoing | $220 Million

The Montebello Corridor Grade Separation Project comprises two separate components that impact four current at-grade crossings with the Union Pacific Railroad (UPRR) within the City of Montebello. Construction of a bridge at the UPRR crossing at Montebello Boulevard and at Olympic Boulevard, creating a roadway underpass at both.

 

ZTC’s scope of work includes ongoing welding inspection and Non-Destructive Testing (NDT) inspection of the fabrication of Steel Girders and Thompson Metal Fabrication (Vancouver, WA) , as well as QA Precast Inspection of Precast Prestressed Concrete Girders at Con-Fab Shafter (Shafter, CA). inspection at Schuff Steel, Lindon, Utah.