top of page

Fullerton Road Grade Separation

Client| Alameda Corridor East 

2022 - Present | $250 Million

The Fullerton Road Grade Separation Project would lower Fullerton Road under the existing Union Pacific railroad tracks in the City of Industry and unincorporated area of Los Angeles County, between Rowland Street and State Route 60 (SR-60). Plans call for constructing a six-lane roadway underpass on Fullerton Road, four-track railroad bridge and bridge for Railroad Street spanning Fullerton Road. Gale Avenue would be lowered at the intersection with Fullerton Road.

 

ZTC’s scope of work includes Non-Destructive Testing (NDT) Magnet Particle Testing (MT) inspection and performing Material on Hand (MOH) inspection of plate and Okay to Cut (OTC), monitoring fastener installation and performing final tensioning verification between Bent 2 and Abutment 3, and performing an in-process fabrication and weld inspection at Schuff Steel, Lindon, Utah.

© 2025 ZT Consulting Group, Inc.

  • Twitter - Grey Circle
  • LinkedIn - Grey Circle
bottom of page